Moldelectrica Transmission Network Rehabilitation project

Stronger connectivity
Energy
6.000.000 Euro
EBRD
2013 - 2017
Finalised
The aim of the project is to rehabilitate the existing internal power transmission network of Moldelectrica, the state owned Moldovan transmission system operator, in order to strengthen regional interconnections and to develop trade in regional electricity. 

The project also aims to strengthen links with the European electricity system, which is a priority for Moldova as it will help cement its association with the Energy Community Treaty. These links will facilitate the integration of Moldova's transmission grid into the European Network of Transmission System Operators for Electricity (ENTSO-E). The project includes the design and rehabilitation of a number of substations and transmission lines. This rehabilitation is expected to lead to improved security in the transmission network and energy efficiency. The replacement of the existing fleet of transformers is expected to lead to an efficiency gain of about 30%, reducing CO2 emissions by about 1 5,000 to 20,000 tonnes of C02 per year. Currently the consultant for the Project Implementation Unit and supervision support is being contracted and the procurement of the project will start in the second half of 2013. 

Address map and contacts

Timis street, Chisinau

Photo and video galery